Colin Maher Design connot undertake any kitchen removals or disposals. All plumbing and electrical work must be undertaken by nominated contractors.
- •Due to unforeseen circumstances that con arise during production, a delivery date cannot be confirmed until 1 week prior to installation.
Any alterations to kitchen plans or amendments to production checklists after sign off may Incur additional charges.
Please be aware CAD drawings are for illustration purposes only. - •Stone worktops would have a lead time of 7-10 days post kitchen installation/stone templating.
Paint finishes on a timber surface can show minor imperfections due to the characteristics of both products. - •Solid timber is a natural product which is prone to movement as a result of changes in room temperature. When painted with a solid colour the seasonal movements become apparent. Small paint cracks can happen due to the nature of natural timber.
It is not possible to get a 100% colour match from a swatch; slight colour variation may occur - •Final payments must be paid 3 working days prior to delivery of the kitchen.
If the client is supplying their own appliances, they must ensure all appliance codes are provided at the point of sign off and that all appliances are on site during installation. - •Any service work on appliances will require the client contacting the distributor directly.